Abstract: Some types of loads require more current during startup than when ruNNing. Other loads can be limited to a lower-powercurrent during startup but require a higher operating current. This article describes an application circuit that automatically adjusts apower circuit’s overcurrent protection level up or down after startup is complete.
上传时间: 2013-10-23
上传用户:swaylong
While simplicity and high effi ciency (for cool ruNNing) areno longer optional features in isolated power supplies, itis traditionally diffi cult to achieve both. Achieving higheffi ciency often requires the use of advanced topologiesand home-brewed secondary synchronous rectifi cationschemes once reserved only for higher power applications.This only adds to the parts count and to the designcomplexity associated with the reference and optocouplercircuits typically used to maintain isolation. Fortunately, abreakthrough IC makes it possible to achieve both high efficiency and simplicity in a synchronous fl yback topology.The LT®3825 simplifi es and improves the performance oflow voltage, high current fl yback supplies by providingprecise synchronous rectifi er timing and eliminating theneed for optocoupler feedback while maintaining excellentregulation and superior loop response.
上传时间: 2013-10-16
上传用户:wayne595
为了改变目前电网现场作业管理的变电巡检、变电检修试验、输电线路巡检检修等管理系统各自独立运行,信息不能共享,功能、效率受限,建设和维护成本高的现状,提出了采用B/S+C/S构架模式,将各现场作业管理模块和生产MIS(管理系统)集成为一体的现场作业管理系统的设计方案,做到各子系统和生产MIS软硬资源共享,做到同一数据唯一入口、一处录入多处使用。各子系统设备人员等基础信息来源于生产管理系统,各子系统又是生产管理系统的作业数据、缺陷信息的重要来源。经过研究试用成功和推广应用,目前该系统已在江西电网220 kV及以上变电站全面应用。 Abstract: In order to improve the status that the substation field inspection system, substation equipments maintenance and testing system, power-line inspection and maintenance system are ruNNing independent with each other. They can?蒺t share the resource information which accordingly constrains their functions and efficiency, and their construction and maintenance costs are high. This paper introduces a field standardized work management system based on B/S+C/S mode, integrating all field work management systems based on MIS and share the equipments and employee?蒺s data of MIS,the field work data of the sub systems are the source information of MIS, by which the same single data resouce with one-time input can be utilized in multiple places. After the research and testing, this system is triumphantly using in all 220kV and above substations in Jiangxi grid.
上传时间: 2013-11-15
上传用户:han_zh
对于传统的跑步机无法联机组网,保存历史数据,实时调试等问题,介绍了一个由多台跑步机通过RS-232串行总线与上位机相连组成的跑步机联网系统。系统采用W77E58作为下位机核心控制器件,它具有双串行通讯端口,其中一个串口用于与变频器通讯,另一个串口则与上位机相连,构成跑步机网络。 Abstract: The traditional ruNNing machine can not be connected to a network, saving historical data, real time debug etc.In this paper,a new network system which is composed of ruNNing machines connected by a RS-232 communication bus is introduced.In the system,W77E58 is used as a core control unit.W77E58 has two serial ports,one is connected to the inverter and the other is connected to the PC. Thus a network appears.
上传时间: 2014-12-27
上传用户:哇哇哇哇哇
介绍了电力操作电源与智能电池巡检系统的特点,给出了一种基于超低功耗单片机MSP430 F149针对中小型变电站自动化运行的专用设备的基本设计原理及实现方法,最后给出了详细硬件构成和软件实现。该系统能满足中小型变电站安全、可靠、自动运行的要求,并通过与上位机的串行通信实现变电站的远程管理和控制。 Abstract: The characters of the intelligent battery data logging system of the electric operation power are introduced.The basic design principle and the implemented methods of the special equipment which only designed for the middle or small transformer substation based on MSP430F149 are prescribed. Finally, the hardware block diagram and the software flow chart are also given. The function that the system finally needs to realize can basically meet with the middle or small transformer substation’s satisfy, reliably,and automatic ruNNing.And it can also realize the transformer substation long-distance management and control by serial communicating with the host computer.
上传时间: 2013-11-25
上传用户:黄华强
The MSP-FET430PIF is a Parallel Port interface (does not include target board) that is used to program and debug MSP430 FET tools and test boards through the JTAG interface. This interface is included in our FET tools, but sold without the development board. This interface uses a Parallel PC Port to communicate to the Debugger Software (IAR Kickstart software included) ruNNing on the PC. The interface uses the standard 14 pin header to communicate to the MSP430 device using the standard JTAG protocol. The flash memory can be erased and programmed in seconds with only a few keystrokes, and since the MSP430 flash is extremely low power, no external power supply is required. The tool has an integrated software environment and connects directly to the PC which greatly simplifies the set-up and use of the tool. The flash development tool supports development with all MSP430 flash parts. Features MSP430 debugging interface to connect a MSP430-Flash-device to a Parallel port on a PC Supports JTAG debug protocol (NO support for Spy-Bi-Wire (2-wire JTAG) debug protocol, Spy-Bi-Wire (2-wire JTAG) is supported by MSP-FET430UIF) Parallel Port cable and a 14-conductor target cable Full documentation on CD ROM Integrated IAR Kickstart user interface which includes: Assembler Linker Limulator Source-level debugger Limited C-compiler Technical specifications: Backwardly compatable with existing FET tool boards.
上传时间: 2013-10-26
上传用户:fengweihao158@163.com
This application note describes how to build a system that can be used for determining theoptimal phase shift for a Double Data Rate (DDR) memory feedback clock. In this system, theDDR memory is controlled by a controller that attaches to either the OPB or PLB and is used inan embedded microprocessor application. This reference system also uses a DCM that isconfigured so that the phase of its output clock can be changed while the system is ruNNing anda GPIO core that controls that phase shift. The GPIO output is controlled by a softwareapplication that can be run on a PowerPC® 405 or Microblaze™ microprocessor.
上传时间: 2013-10-15
上传用户:euroford
The Tri-Mode Ethernet MAC (TEMAC) UltraController-II module is a minimal footprint,embedded network processing engine based on the PowerPC™ 405 (PPC405) processor coreand the TEMAC core embedded within a Virtex™-4 FX Platform FPGA. The TEMACUltraController-II module connects to an external PHY through Gigabit Media IndependentInterface (GMII) and Management Data Input/Output (MDIO) interfaces and supports tri-mode(10/100/1000 Mb/s) Ethernet. Software ruNNing from the processor cache reads and writesthrough an On-Chip Memory (OCM) interface to two FIFOs that act as buffers between thedifferent clock domains of the PPC405 OCM and the TEMAC.
上传时间: 2013-10-26
上传用户:yuzsu
CodeWarrior Development Tool Suites are comprehensive integrated developmentenvironments (IDE) that provide a highly visual and automated framework toaccelerate the development of the most complex embedded applications. Acrossmost stages of the development cycle, we offer tools to help configure, debug andoptimize your design built on Freescale MPUs, MCUs, DSPs and DSCs. These toolsuites provide solutions to get your design up and ruNNing fast.
标签: CodeWarrior 开发工具套件
上传时间: 2013-11-07
上传用户:youlongjian0
Abstract: When people want portable music, they usually rely on battery-powered audio devices. With a bit of engineeringblood (or curiosity) ruNNing in your veins, it is not difficult to build a wireless Bluetooth® stereo audio system that can becontrolled with any device that has a Bluetooth connection and a music player
上传时间: 2013-10-09
上传用户:天空说我在