Occasionally, we are tasked with designing circuitry for aspecific purpose. The request may have customer originsor it may be an in-house requirement. Alternately, a circuitmay be developed because its possibility is simply tooattractive to ignore1. Over time, these circuits accumulate,encompassing a wide and useful body of proven capabilities.They also represent substantial effort. These considerationsmake publication an almost obligatory propositionand, as such, a group of circuits is presented here. This isnot the first time we have displayed such wares and, giventhe encouraging reader response, it will not be the last2.Eighteen circuits are included in this latest effort, roughlyarranged in the categories given in this publication’s title.They appear at the next paragraph.
上传时间: 2013-11-12
上传用户:012345
Providing power for the Pentium® microprocessor family isnot a trivial task by any means. In an effort to simplify thistask we have developed a new switching regulator controlcircuit and a new linear regulator to address the needs ofthese processors. Considerable time has been spent developingan optimized decoupling network. Here are severalcircuits using the new LTC®1266 synchronous buck regulatorcontrol chip and the LT®1584 linear regulator toprovide power for Pentium processors and Pentium VREprocessors. The Pentium processor has a supply requirementof 3.3V ±5%. The Pentium VRE processor requires3.500V ±100mV.
上传时间: 2013-11-01
上传用户:名爵少年
Linear Technology has a sabbatical program. Every fiveyears employees are granted sabbatical leave, which maylast up to six weeks. You have 18 months from each fiveyear employment anniversary to take the leave. Sabbaticalis fully company paid and has no restrictions. The time isyours to do with as you please.
上传时间: 2013-10-19
上传用户:851197153
For a variety of reasons, it is desirable to charge batteriesas rapidly as possible. At the same time, overchargingmust be limited to prolong battery life. Such limitation ofovercharging depends on factors such as the choice ofcharge termination technique and the use of multi-rate/multi-stage charging schemes. The majority of batterycharger ICs available today lock the user into one fixedcharging regimen, with at best a limited number ofcustomization options to suit a variety of application needsor battery types. The LTC®1325 addresses these shortcomingsby providing the user with all the functionalblocks needed to implement a simple but highly flexiblebattery charger (see Figure 1) which not only addressesthe issue of charging batteries but also those of batteryconditioning and capacity monitoring.
上传时间: 2013-10-19
上传用户:royzhangsz
为了改变目前电网现场作业管理的变电巡检、变电检修试验、输电线路巡检检修等管理系统各自独立运行,信息不能共享,功能、效率受限,建设和维护成本高的现状,提出了采用B/S+C/S构架模式,将各现场作业管理模块和生产MIS(管理系统)集成为一体的现场作业管理系统的设计方案,做到各子系统和生产MIS软硬资源共享,做到同一数据唯一入口、一处录入多处使用。各子系统设备人员等基础信息来源于生产管理系统,各子系统又是生产管理系统的作业数据、缺陷信息的重要来源。经过研究试用成功和推广应用,目前该系统已在江西电网220 kV及以上变电站全面应用。 Abstract: In order to improve the status that the substation field inspection system, substation equipments maintenance and testing system, power-line inspection and maintenance system are running independent with each other. They can?蒺t share the resource information which accordingly constrains their functions and efficiency, and their construction and maintenance costs are high. This paper introduces a field standardized work management system based on B/S+C/S mode, integrating all field work management systems based on MIS and share the equipments and employee?蒺s data of MIS,the field work data of the sub systems are the source information of MIS, by which the same single data resouce with one-time input can be utilized in multiple places. After the research and testing, this system is triumphantly using in all 220kV and above substations in Jiangxi grid.
上传时间: 2013-11-15
上传用户:han_zh
Permission to make digital or hard copies of all or part of this work forpersonal or classroom use is granted without fee provided that copies arenot made or distributed for profit or commercial advantage and that copiesbear this notice and the full citation on the first page. To copy otherwise, torepublish, to post on servers or to redistribute to lists, requires prior specificpermission.
标签: 数字电源
上传时间: 2013-10-16
上传用户:dddddd
Features: High efficiency, high reliability, low cost AC input range selected by switch 100% full load burn-in test Protections: Short circuit / Over load Fixed switching frequency at 25KHz Cooling by free air convection 1 year warranty Dimensions: 199*98*38mm (L*W*H)
标签: Switchin Output Single SKS
上传时间: 2013-10-30
上传用户:taa123456
Demonstration circuit 1562A is an engineering toolto design and evaluate the LTC699X-X family ofTimerBlox circuits. The center section of the boardcontains a pre-configured TimerBlox function.DC1562A comes in twelve timing function variationsas outlined in Table 1.Surrounding the center board is a ”playground”prototyping area. The prototyping area has padsfor Dip-8, S8, MS8, or S6 packages with breadboarding connections to each pin and two convenientpower buses and ground bus surrounding theentire area. This area is for conditioning signals tocontrol the timer function and for adding loads controlled in time.
上传时间: 2013-10-18
上传用户:如果你也听说
Keil C51是美国Keil Software公司出品的51系列兼容单片机C语言软件开发系统,与汇编相比,C语言在功能上、结构性、可读性、可维护性上有明显的优势,因而易学易用。Keil提供了包括C编译器、宏汇编、连接器、库管理和一个功能强大的仿真调试器等在内的完整开发方案,通过一个集成开发环境(uVision)将这些部分组合在一起。运行Keil软件需要WIN98、NT、WIN2000、WINXP等操作系统。如果你使用C语言编程,那么Keil几乎就是你的不二之选,即使不使用C语言而仅用汇编语言编程,其方便易用的集成环境、强大的软件仿真调试工具也会令你事半功倍。 解压缩以后安装,步骤如下: 1.打开up51v706a.txt(本文件)记下安装序列号。进入setup目录点击setup.exe进行安装; 2.选择Install Support....全新安装,以前没有安装过或者放弃以前的序列号安装; 选择Update Current Installation升级安装,将可以保持原来的序列号,不必再次输入 3.选择Full安装,Next->Yes(接受版权信息)->选择安装目录->Next->输入序列号、姓名、公司 等,除了序列号以外,都随意,可以如实输入你的姓名等。->next-> ....直到安装完成。 注意: 1.每次安装都必须进行这几步,每次都需要重新写入AddOn标识; 2.假如安装过程中存在病毒防火墙,可能会产生xcopy错误使安装失败,此时请先 关闭病毒防火墙,然后再安装; 3.安装前必须退出正在运行的Keil软件,否则也会产生xcopy错误使安装失败; 4.安装过程中可能会出现安装Secrity Key错误,点击确定即可。 这组安装码可以使用keil C51软件到2033年12月底,够用了吧。 Ident = Y1DZKM (这个号码已经输入在addon目录下的文件中,你不必理会了) SN = K1DZP-5IUSH-A01UE *************************************** 0xfd汉字补丁已经预先处理。安装以后可以打开工程\keil\c51\examples\0xfd\ee.uv2检验
上传时间: 2013-10-18
上传用户:takako_yang
下载后请修改文件扩展名为sch.体积和代码都很小,集成电路(ic)全为贴片,祝各位有所启发。 mcu:at89c4051 fm:tea5767 time:ds1302 temp:ds18b20
上传时间: 2013-12-28
上传用户:xiaoyaa