The LTC®4099 high effi ciency USB power manager andLi-Ion/Polymer battery charger seamlessly managespower distribution from multiple sources in portableapplications. It is differentiated from other USB powermanagers by its bidirectional I2C port that allows the hostmicroprocessor to control and monitor all aspects of theUSB power management and battery charging processes.In addition, a programmable interrupt generation functionalerts the host microprocessor to changes in device statusand provides unprecedented control of power managementfunctions. This high degree of confi gurability allowspost-layout changes in operation, even changes in thefi eld, and it allows a single qualifi ed device to be usedin a variety of products, thus reducing design time andeasing inventory management.
上传时间: 2013-10-22
上传用户:18602424091
Designers spend much time combating thermal effects incircuitry. The close relationship between temperature andelectronic devices is the source of more design headachesthan any other consideration.
上传时间: 2013-10-17
上传用户:风之骄子
Occasionally, we are tasked with designing circuitry for aspecific purpose. The request may have customer originsor it may be an in-house requirement. Alternately, a circuitmay be developed because its possibility is simply tooattractive to ignore1. Over time, these circuits accumulate,encompassing a wide and useful body of proven capabilities.They also represent substantial effort. These considerationsmake publication an almost obligatory propositionand, as such, a group of circuits is presented here. This isnot the first time we have displayed such wares and, giventhe encouraging reader response, it will not be the last2.Eighteen circuits are included in this latest effort, roughlyarranged in the categories given in this publication’s title.They appear at the next paragraph.
上传时间: 2013-11-12
上传用户:012345
A recent trend in the design of portable devices has beento use ceramic capacitors to filter DC/DC converter inputs.Ceramic capacitors are often chosen because of theirsmall size, low equivalent series resistance (ESR) and highRMS current capability. Also, recently, designers havebeen looking to ceramic capacitors due to shortages oftantalum capacitors.
上传时间: 2013-11-05
上传用户:comer1123
Providing power for the Pentium® microprocessor family isnot a trivial task by any means. In an effort to simplify thistask we have developed a new switching regulator controlcircuit and a new linear regulator to address the needs ofthese processors. Considerable time has been spent developingan optimized decoupling network. Here are severalcircuits using the new LTC®1266 synchronous buck regulatorcontrol chip and the LT®1584 linear regulator toprovide power for Pentium processors and Pentium VREprocessors. The Pentium processor has a supply requirementof 3.3V ±5%. The Pentium VRE processor requires3.500V ±100mV.
上传时间: 2013-11-01
上传用户:名爵少年
Linear Technology has a sabbatical program. Every fiveyears employees are granted sabbatical leave, which maylast up to six weeks. You have 18 months from each fiveyear employment anniversary to take the leave. Sabbaticalis fully company paid and has no restrictions. The time isyours to do with as you please.
上传时间: 2013-10-19
上传用户:851197153
For a variety of reasons, it is desirable to charge batteriesas rapidly as possible. At the same time, overchargingmust be limited to prolong battery life. Such limitation ofovercharging depends on factors such as the choice ofcharge termination technique and the use of multi-rate/multi-stage charging schemes. The majority of batterycharger ICs available today lock the user into one fixedcharging regimen, with at best a limited number ofcustomization options to suit a variety of application needsor battery types. The LTC®1325 addresses these shortcomingsby providing the user with all the functionalblocks needed to implement a simple but highly flexiblebattery charger (see Figure 1) which not only addressesthe issue of charging batteries but also those of batteryconditioning and capacity monitoring.
上传时间: 2013-10-19
上传用户:royzhangsz
为了改变目前电网现场作业管理的变电巡检、变电检修试验、输电线路巡检检修等管理系统各自独立运行,信息不能共享,功能、效率受限,建设和维护成本高的现状,提出了采用B/S+C/S构架模式,将各现场作业管理模块和生产MIS(管理系统)集成为一体的现场作业管理系统的设计方案,做到各子系统和生产MIS软硬资源共享,做到同一数据唯一入口、一处录入多处使用。各子系统设备人员等基础信息来源于生产管理系统,各子系统又是生产管理系统的作业数据、缺陷信息的重要来源。经过研究试用成功和推广应用,目前该系统已在江西电网220 kV及以上变电站全面应用。 Abstract: In order to improve the status that the substation field inspection system, substation equipments maintenance and testing system, power-line inspection and maintenance system are running independent with each other. They can?蒺t share the resource information which accordingly constrains their functions and efficiency, and their construction and maintenance costs are high. This paper introduces a field standardized work management system based on B/S+C/S mode, integrating all field work management systems based on MIS and share the equipments and employee?蒺s data of MIS,the field work data of the sub systems are the source information of MIS, by which the same single data resouce with one-time input can be utilized in multiple places. After the research and testing, this system is triumphantly using in all 220kV and above substations in Jiangxi grid.
上传时间: 2013-11-15
上传用户:han_zh
Demonstration circuit 1562A is an engineering toolto design and evaluate the LTC699X-X family ofTimerBlox circuits. The center section of the boardcontains a pre-configured TimerBlox function.DC1562A comes in twelve timing function variationsas outlined in Table 1.Surrounding the center board is a ”playground”prototyping area. The prototyping area has padsfor Dip-8, S8, MS8, or S6 packages with breadboarding connections to each pin and two convenientpower buses and ground bus surrounding theentire area. This area is for conditioning signals tocontrol the timer function and for adding loads controlled in time.
上传时间: 2013-10-18
上传用户:如果你也听说
新唐M0电机驱动芯片,MT530系列详细应用介绍。
上传时间: 2013-10-26
上传用户:mahone