英文书《Fast Fourier Transforms, Second Edition》附带的MATLAB实例
标签: Transforms Edition Fourier Second
上传时间: 2016-12-20
上传用户:iswlkje
英文书《The Finite Element Method Using MATLAB, Second Edition》附带实例
标签: Element Edition Finite Method
上传时间: 2016-12-20
上传用户:515414293
Software Architecture in Practice, Second Edition By Len Bass, Paul Clements, Rick Kazman Publisher : Addison Wesley Pub Date : April 11, 2003 ISBN : 0-321-15495-9 Pages : 560
标签: Architecture Software Practice Clements
上传时间: 2013-12-26
上传用户:eclipse
selects the mux channel and configures the MAX197 for second write pulse, written with ACQMOD = 0, termi- either unipolar or bipolar input range. A write pulse (WR nates acquisition and starts conversion on WR°Os risin + CS) can either start an acquisition interval or initiate a edge (Figure 6). However, if the second control byte combined acquisition plus conversion. The sampling contains ACQMOD = 1, an indefinite acquisition interval interval occurs at the end of the acquisition interval. is restarted. The ACQMOD bit in the input control byte offer
标签: configures the selects channel
上传时间: 2013-12-09
上传用户:
selects the mux channel and configures the MAX197 for second write pulse, written with ACQMOD = 0, termi- either unipolar or bipolar input range. A write pulse (WR nates acquisition and starts conversion on WR°Os risin + CS) can either start an acquisition interval or initiate a edge (Figure 6). However, if the second control byte combined acquisition plus conversion. The sampling contains ACQMOD = 1, an indefinite acquisition interval interval occurs at the end of the acquisition interval. is restarted. The ACQMOD bit in the input control byte offer
标签: configures the selects channel
上传时间: 2016-12-24
上传用户:朗朗乾坤
selects the mux channel and configures the MAX197 for second write pulse, written with ACQMOD = 0, termi- either unipolar or bipolar input range. A write pulse (WR nates acquisition and starts conversion on WR°Os risin is restarted. The ACQMOD bit in the input control byte offer+ CS) can either start an acquisition interval or initiate a edge (Figure 6). However, if the second control byte combined acquisition plus conversion. The sampling contains ACQMOD = 1, an indefinite acquisition interval interval occurs at the end of the acquisition interval.
标签: configures the selects channel
上传时间: 2016-12-24
上传用户:yzhl1988
This file (the project file) contains information at the project level and is used to build a single project or subproject. Other users can share the project (.dsp) file, but they
标签: project file information the
上传时间: 2013-12-18
上传用户:cainaifa
JavaScript 2.0: The Complete Reference, Second Edition
标签: JavaScript Reference Complete Edition
上传时间: 2014-01-06
上传用户:彭玖华
C++数值算法 影音版 Numerical Recipes in C++: The Art of Scientific Computing, Second Edition
标签: Scientific Numerical Computing Edition
上传时间: 2017-01-14
上传用户:Andy123456
if an application works with restricted low level system calls, it must obtain a Microsoft Mobile2Market privileged signature. To get a privileged signature, logo certification is now a requirement, not an option! This article shows how to abstract some of the most common issues a developer will encounter when creating a native code application that must be logo certified for each platform. windowsmobile5.0以上版本logo注册例子,可以加入自己的工程文件中。
标签: application restricted Microsoft Mobile2Ma
上传时间: 2017-01-16
上传用户:13160677563